What Is FMEA?
FMEA is a systematic risk analysis based on an inductive approach, which links causes to their effects. The acronym stands for Failure Mode and Effects Analysis.
The purpose of FMEA is to minimize or, where possible, eliminate risks associated with product design or the manufacturing process.
FMEA is closely associated with the automotive industry, which has played a significant role in developing this method. The fundamental guidelines for conducting risk analysis are defined in the AIAG & VDA FMEA Handbook. Importantly, this handbook also serves as a starting point for other standards.
FMEA is one of the so-called Core Tools – key quality tools used in the automotive industry. The group also includes:
- SPC (Statistical Process Control)
- APQP
- PPAP
- MSA
Another fairly popular risk analysis tool is the risk matrix, which is discussed in detail in the following article:
- Risk Matrix – 3×3, 4×4, or 5×5?
What Are the Types of FMEA? How Does D-FMEA Differ from P-FMEA?
The AIAG & VDA FMEA Handbook distinguishes between two main types of risk analysis and one supplementary analysis:
- D-FMEA (Design FMEA)
- P-FMEA (Process FMEA)
- FMEA-MSR (FMEA for Monitoring and System Response) – a supplement to D-FMEA
D-FMEA
D-FMEA is a risk analysis performed during product design or when design changes are introduced. It considers the functionality of individual product characteristics as well as the feasibility of manufacturing the product from a technological standpoint. In short, D-FMEA helps minimize the risk of design-related defects.
P-FMEA
P-FMEA is a type of risk analysis aimed at eliminating or minimizing the risk of producing non-conforming products due to errors in manufacturing and assembly processes. It is typically conducted during process design and continuously updated throughout process execution. P-FMEA therefore helps reduce the risk of manufacturing non-conforming products.
FMEA-MSR
FMEA-MSR is the latest type of risk analysis and serves as a supplement to D-FMEA. Its purpose is to verify whether a monitoring system can detect and respond appropriately to safety-related and regulatory issues that may arise while a product is in use.
For example, if a product fails during use and the failure could pose a safety risk, can the built-in system detect it? And if so, what happens next?
Other Types of FMEA
In addition to the three types of risk analysis discussed above, you may also encounter the following:
- C-FMEA (Concept FMEA) – performed during product concept development.
- M-FMEA (Machinery FMEA) – used during machine design and construction.
- S-FMEA (System FMEA) – analyzes the proper functioning of an entire system rather than just an individual component.
- S-FMEA or SW-FMEA (Software FMEA) – software risk analysis.
However, as mentioned earlier, these types are not specifically listed in the AIAG & VDA FMEA Handbook.
What Are the Steps of FMEA?
The AIAG & VDA FMEA Handbook defines the procedure for conducting a risk analysis. It is based on seven consecutive steps.
The 7 Steps of FMEA According to AIAG & VDA:
- Planning and Preparation
- Structure Analysis
- Function Analysis
- Failure Analysis
- Risk Analysis
- Optimization
- Results Documentation
1. Planning and Preparation
The planning and preparation phase is based on the 5T rule. It consists of five key areas that must be considered to properly define the scope of the analysis.
The 5T Rule:
- FMEA inTent
- Timing
- Team
- Tasks
- Tools
FMEA inTent
The first step is to determine the reason for conducting the risk analysis. For example, FMEA may be performed for a completely new product, a product undergoing design changes, or as part of activities related to a non-conforming product. In short, we simply need to answer the question: Why are we conducting this analysis in the first place?
Timing
First and foremost, we need to establish a deadline for completing the analysis to ensure it is finished before the new product or changes are physically implemented. This deadline can serve as a starting point, while the actual duration of the analysis will depend on its scope and the complexity of the project.
We should also allow some extra time to avoid rushing to complete the FMEA at the last minute. If applicable, APQP should serve as a useful reference for planning the schedule.
Team
Building the working team starts with appointing an FMEA moderator – someone with a thorough understanding of the methodology. The moderator will manage the team and ensure that the analysis is conducted correctly.
It goes without saying that the quality of the FMEA results depends on the competence of the people involved in the project. Above all, team members must have relevant knowledge of the product or process being analyzed.
Tasks
We also need to define the tasks to be performed at each stage of the FMEA, along with the expected outcomes. This is particularly important because these outcomes are often reviewed by management or the customer.
Tools
Finally, we need to determine which tools will be used to conduct the analysis. These may include dedicated software or a specially developed spreadsheet. Naturally, the selected method must comply with customer requirements, if any.
2. Structure Analysis
This step involves analyzing and defining the structure using three levels. The elements assigned to each level depend on the type of FMEA being performed. A structure tree can be useful for visually illustrating the interactions between the different levels.
D-FMEA and FMEA-MSR
For D-FMEA and FMEA-MSR, we define how the system is structured:
- Higher-level assembly – switch
- Focus element – spring
- Lower-level component or product characteristic (if the focus element is not an assembly) – spring free length
P-FMEA
For P-FMEA, we identify:
- Process item – the name of the system, subsystem, part, or process – spring
- Process step – Operation #30: Wire Cutting
- Process work element, based on the 4M categories (Man, Machine, Material, and Environment) – guillotine cutter
3. Function Analysis
At this stage, we analyze the requirements that must be met. As with structure analysis, we use three levels to organize the analysis.
D-FMEA
For D-FMEA, we define:
- Function and requirement of the higher-level assembly – how it operates: Activating the switch causes the machine door to open.
- Function and requirement of the focus element – how it ensures that the higher-level assembly functions as intended: The spring allows the button to be pressed and return to its original position.
- Function and requirement of the lower-level component or product characteristic – how it ensures the focus element functions correctly: The spring’s free length allows it to be installed in the switch and prevents it from falling out.
P-FMEA
For P-FMEA, we need to define:
- Functions of the process item – the role of a given characteristic and its impact on internal customers, external customers, and the end user: Enables the required free length to be achieved after the spring coiling operation.
- Functions of the process step – the characteristics the product must have: The wire is cut to the required length.
- Function of the process work element – the requirements it must meet: The guillotine cutter cuts the wire to the required length.
4. Failure Analysis
The fourth step involves analyzing each identified focus element to determine what could go wrong.
D-FMEA
For D-FMEA, we need to define:
- Failure Mode (FM) – the way in which the focus element could fail.
- Failure Cause (FC) – the cause of the failure, based on the lower-level component or product characteristic.
- Failure Effects (FE) – the effects of the failure on the higher-level assembly and the end user.
P-FMEA
For P-FMEA, we need to identify:
- The failure mode of the focus element.
- The failure cause, based on the lower-level component or characteristic and the 4M Ishikawa diagram.
- The failure effects on the higher-level assembly, internal and external customers, and the end user.
5. Risk Analysis
At this stage, we assess the risk associated with a given problem. The results will help us determine which items require immediate action and which risks are acceptable in their current state. To do this, we first need to identify:
- Existing preventive controls that help prevent the problem from occurring (PC – Prevention Controls).
- Detection controls that can identify both the problem and its effects (DC – Detection Controls).
Risk is assessed using three parameters:
- Severity (S)
- Occurrence (O)
- Detection (D)
Each parameter is assigned a rating from 1 (best-case scenario) to 10 (worst-case scenario). The dedicated tables in the AIAG & VDA FMEA Handbook are essential for this assessment, as they define the criteria for each rating.
A similar approach is used in the next step, when we determine the Action Priority (AP). Based on the S, O, and D ratings, we can establish how significant the problem is.
The AP can be classified as:
- Low (L)
- Medium (M)
- High (H)
- Error
In the last case, the table provides detailed information explaining why the error occurred. The relevant parameters must therefore be reassessed.
6. Optimization
Now that we know which issues pose the greatest risks, we can take action. At this stage, we need to plan appropriate actions to reduce risk, assign people responsible for implementing them, and set deadlines for completion.
When planning individual improvements, we focus primarily on the S, O, and/or D parameters that are most relevant to the problem being addressed.
Once the actions have been implemented and objective evidence has been provided, the S, O, and/or D ratings must be updated, and the Action Priority (AP) reassessed.
7. Results Documentation
This is the final step of FMEA. As the name suggests, its purpose is to document the actions taken and the results achieved. Where necessary, the results of the analysis can be communicated internally within the organization and to the customer.
We should also remember that FMEA is a living document. This means it must be reviewed regularly and updated whenever necessary – for example, when a non-conformance occurs.
How Does RPN Differ from AP?
Introduced in 2019, the Action Priority (AP) method determines the priority of actions related to individual issues identified during the failure analysis stage. With the release of the combined AIAG & VDA FMEA Handbook, it replaced another indicator that had been used for years: RPN. Let’s take a brief look at what RPN is and how it is calculated.
RPN (Risk Priority Number) is a risk rating based, like AP, on three parameters: S, O, and D. The difference is that instead of looking up the result in a table, we use a simple mathematical formula:
RPN = S*O*D
So why was this change necessary if the methodology itself had not changed significantly in theory? The key word here is in theory. Under the old method, the results could often be misleading. The following example illustrates why this matters.
Problem #1
- Severity (S) – 9
- Occurrence (O) – 3
- Detection (D) – 4
Problem #2
- Severity (S) – 3
- Occurrence (O) – 9
- Detection (D) – 4
Problem #3
- Severity (S) – 4
- Occurrence (O) – 3
- Detection (D) – 9
Each of these cases is different and can have different consequences, particularly when we consider severity and detectability. However, all three cases produce the same RPN value.
Does ISO 9001 Require the Use of FMEA for Risk Analysis?
The latest revision of ISO 9001, published in 2015, introduced several significant changes. One of them was the adoption of a risk-based approach, replacing the previous preventive action requirements. Organizations were now required to analyze both the risks and opportunities associated with their operations and take appropriate action in response.
Risk and opportunity analysis became an integral part of the Quality Management System (QMS) and its processes. Of course, leadership must set the example. That is why ISO 9001 places considerable emphasis on top management promoting and applying a risk-based approach.
When a non-conformance occurs, we are required to update the risk and opportunity analysis conducted during the planning stage to account for the new circumstances. We must also remember to evaluate the effectiveness of actions taken to minimize specific risks or address emerging opportunities.
You can learn more about ISO 9001 in our series of articles dedicated to this standard. Start with Part 1:
- ISO 9001 Requirements – How to Implement a Quality Management System Step by Step (1/3)
However, the standard does not prescribe a specific method for conducting risk analysis. It refers to ISO 31000 for guidance on risk management, while using FMEA can be a practical way to help meet the requirements of ISO 9001.
The History of FMEA
The origins of FMEA date back to the 1940s. Interestingly, they are not connected to the automotive industry, even though the automotive sector has pioneered many widely used solutions. In this case, however, things developed somewhat differently.
MIL-P-1629 and FMECA
For many years, the widely used approach involved detecting failures and eliminating them after they occurred. While this method may have been effective to some extent, it was far from ideal. The U.S. Department of Defense had recognized these shortcomings for some time, as it could not afford equipment failures in the products it manufactured.
Action was needed, and the methodology had to change. The result was the MIL-P-1629 procedure, issued in 1949. It described a new approach to eliminating failures by anticipating them before they occurred. This marked the birth of a tool known as FMECA (Failure Mode, Effects, and Criticality Analysis). It proved effective enough to be adopted in other industries as well.
NASA and the Apollo Program
The 1960s were marked by the Cold War and the arms race between East and West. This competition also extended into space, where the Soviet Union was leading at the time. The U.S. government could not afford to let its rival dominate, nor could it risk a highly publicized failure. As a result, starting with the Apollo program, NASA also began analyzing and eliminating risks that could be associated with a given mission.
NASA used the proven FMECA method, but also introduced a modified version of this tool: FMEA (Failure Mode and Effects Analysis). The aerospace industry was quick to follow. In 1967, SAE (Society of Automotive Engineers) published the ARP926 standard, dedicated to risk analysis based on the FMECA method.
Ford Pinto and Fuel System Issues
This brings us to the following decade – the 1970s – and the automotive industry mentioned earlier. Ford was a pioneer in this area, facing a series of lawsuits over the design of the fuel system in its Pinto model. At the time, greater emphasis began to be placed on safety and regulatory requirements. Risk analysis was introduced at both the product design stage and throughout the manufacturing process.
FMEA in the Navy and Aviation
In the 1970s, more precisely on November 1, 1974, the U.S. Department of Defense issued the MIL-STD-1629 standard. It provided detailed instructions for conducting FMEA on naval equipment.
Nearly three years later, on June 12, 1977, the U.S. Department of the Navy published a similar document, this time intended for the aviation industry. It was designated MIL-STD-2070(AS). This arrangement remained in place until 1980, when the two standards were combined into a single document: MIL-STD-1629A.
Over the following years, the document received two revision notices. However, the third notice, issued on August 4, 1998, officially canceled the standard. Users were simply advised to adopt other standards instead. They were not left without guidance, though: in 1994, SAE had published the SAE J1739 specification, which provided detailed guidance on applying FMEA during product design, manufacturing, and assembly.
FMEA According to AIAG and VDA 4
The automotive industry was also actively developing this methodology. In 1993, AIAG (Automotive Industry Action Group) published two reference manuals, one of which was dedicated specifically to FMEA. In 1996, risk analysis was also included in VDA 4, a handbook developed by the German automotive industry.
AS13004 and AIAG & VDA FMEA
This brings us to 2017 and, once again, the aerospace industry. That year, SAE published another standard, designated AS13004. Its purpose was to ensure compliance with the AS9100 quality management system standard, as well as other standards such as AS9102 (FAI), AS9103 (Key Characteristics), and AS9145 (APQP).
The second decade of the 21st century also saw intensive collaboration between AIAG and VDA to develop a harmonized approach to FMEA. As a result, a new handbook was published in June 2019, featuring an additional section dedicated to FMEA-MSR.
Summary
FMEA is an inductive method for analyzing and minimizing the risk of failures or problems. The starting point is a potential cause, from which possible effects are identified.
According to the AIAG & VDA FMEA Handbook, the method is divided into three main types:
- D-FMEA – performed during product design.
- P-FMEA – used to minimize risks in manufacturing and assembly processes.
- FMEA-MSR – used to evaluate systems responsible for detecting and responding to issues related to safety or regulatory compliance.
FMEA is based on seven consecutive steps that guide us through the entire analysis. The first step, Planning and Preparation, is based on the 5T rule.
In the latest edition of the AIAG & VDA FMEA Handbook, the Action Priority (AP) method replaced the previously used RPN. Instead of calculating a numerical value, we now determine the action priority by referring to a dedicated table provided in the handbook.
FMEA is also an effective tool for supporting risk analysis within ISO 9001 Quality Management Systems. However, it is not a mandatory method prescribed by the standard.
What are your experiences with risk analysis and FMEA? Share your thoughts in the comments section below. See you next time!
FAQ: Frequently Asked Questions
What Is the Difference Between D-FMEA and P-FMEA?
D-FMEA is used to reduce risks during product design, while P-FMEA is used to analyze risks in manufacturing and assembly processes.
What Is FMEA-MSR?
FMEA-MSR is a risk analysis focused on systems that detect and respond to safety-related and regulatory issues. It serves as a supplement to D-FMEA.
What Does the 5T Rule Used in FMEA Define?
The 5T rule helps define five key elements of the analysis: FMEA intent, timing, team, tasks, and tools. It is applied during the first step of FMEA.
What Are the Seven Steps of FMEA?
FMEA consists of seven consecutive steps: Planning and Preparation, Structure Analysis, Function Analysis, Failure Analysis, Risk Analysis, Optimization, and Results Documentation.
What Is the Difference Between RPN and AP?
Both RPN and AP take the same criteria into account: severity, occurrence, and detection. However, they differ in how the final result is determined. RPN is calculated using a formula, whereas AP is determined by referring to a dedicated table.
What Is AP?
AP, or Action Priority, is a risk assessment method that replaced the widely used RPN indicator. It is based on severity, occurrence, and detection ratings, with the final priority determined using a dedicated table.