What Are the Costs of Poor Quality (COPQ), and Why Are They More Than Just “Scrap”?

The Cost of Poor Quality (COPQ) represents the financial price a company pays for every failure in its processes. It is not just the visible scrap, but the entire range of hidden costs incurred when a company manufactures a product or provides a service that does not meet requirements.

From a practical perspective, the costs of poor quality can be divided into:

  • Internal failure costs – a non-conforming product is identified before it leaves the company.
  • External failure costs – a non-conforming product is identified after it has left the company.

A third category, which is often overlooked, is hidden costs of poor quality. This relationship can be perfectly illustrated using the classic Iceberg Model.

Iceberg Model - Hidden Cost of Poor Quality (COPQ)

What Are the Internal Failure Costs?

Internal failure costs include:

  • material costs when a product has to be scrapped
  • labor costs required to rework or repair a product
  • repeat quality inspections or dedicated tests, such as functional testing
  • machine downtime caused by the need for repairs or machines being occupied by parts undergoing rework
  • additional consumption of auxiliary materials and tools used during rework
  • utility costs, such as electricity consumed during rework operations

Good to know! Detecting a non-conforming product before shipment does not necessarily mean that the customer will remain unaware of the issue. This is particularly true when products have serial numbers or are manufactured using customer-supplied materials. The same applies to systems based on the Just-in-Time concept. In such cases, the customer will still be informed about the delivery delay and its cause.

What Are the External Failure Costs?

External failure costs include:

  • reworking or repairing parts, sometimes by another supplier but at our expense
  • the cost of materials required to manufacture a replacement product
  • contractual penalties for defective products, issuing stop-ship notices, or assembly line downtime
  • sorting parts already delivered to the customer, often carried out by third-party companies
  • product recalls in the automotive industry or grounding aircraft fleets when components need to be replaced
  • expedited shipments to ensure that conforming products are delivered to the customer as quickly as possible

However, the fact that a product has already reached the customer does not necessarily mean that the customer will be the one to detect the defect. Sometimes, the supplier directly notifies the customer about the non-conformance. This may happen when similar defects are discovered in other parts during the manufacturing process or when an audit finding has a direct impact on the product.

Good to know! It is common practice for companies to include a clause in purchase orders or long-term agreements requiring suppliers to report any non-conforming products. This is particularly important when potentially affected products may have already been delivered to the customer or are still in transit. Such information must be communicated within a predefined maximum time frame, which can sometimes be as short as 24 hours from the moment the issue is detected.

What Are the Hidden Costs of Poor Quality?

Hidden costs of poor quality are the consequences of non-conforming products that are not directly reflected in financial reports. In other words, they include everything that goes undetected by the ERP system and is not recorded under categories such as “scrap” or “customer complaints.”

Hidden costs of poor quality include:

  • damage to the company’s reputation with customers, which may result in the loss of business, reduced order volumes, or customers choosing alternative suppliers for new projects
  • building up “just in case” inventory to compensate for unstable processes
  • additional, unplanned customer audits or the need to outsource extra quality inspections to third-party companies
  • engineering time spent “putting out fires” and fixing processes instead of implementing preventive measures or developing new products
  • declining employee motivation caused by recurring problems that are never effectively resolved

The Hidden Factory Phenomenon

In the late 1970s, a concept developed by Armand Feigenbaum gained popularity and remains highly relevant to many companies today. According to his research, many organizations have what is known as a hidden factory. This is essentially an invisible department whose sole purpose is to continuously correct errors, sort parts, and perform additional testing. In his work, Feigenbaum estimated that companies of this kind could lose up to 40% of their production capacity on these activities alone.

How to Measure the Cost of Poor Quality Without Complicated Formulas?

The simplest formula for calculating the Cost of Poor Quality (COPQ) takes four basic factors into account:

  • Cmaterial – material costs, e.g. the value of scrapped parts and materials used for rework
  • Clabor – labor costs, e.g. wages of operators, quality inspectors, and engineers (including overtime)
  • Cmachine – processing costs, e.g. tools and utilities consumed during rework, as well as machine depreciation
  • Cextra – extraordinary and external costs, e.g. expedited shipping, customer penalties, and sorting performed by an external company

The Cost of Poor Quality is calculated for each individual event using the following formula:

COPQevent = Cmaterial + Clabor + Cmachine + Cextra

As you can easily see from the formula above, in most cases we can calculate COPQ using only costs classified as internal or external failure costs. The third category, hidden costs of poor quality, is often simply too difficult to estimate or may have long-term implications.

Calculating the Cost of Poor Quality – A Practical Example

Problem scenario:
A short shot (incomplete filling) in a plastic dashboard module was detected during final assembly at the customer’s facility. As a result, the customer placed a hold on a batch of 400 delivered units. Since the issue is urgent, we must send employees immediately to perform a sorting operation. It is scheduled for tomorrow, which happens to be Saturday. Additionally, the process engineering and quality engineering teams have been involved to identify the root cause and implement the necessary corrective actions as quickly as possible.

1. Material costs

Following the inspection, it turned out that the batch of parts delivered to the customer contained 15 defective dashboard modules. They cannot be repaired and will therefore be scrapped. The cost of a single module is 80 USD.

Cmaterial = 15 x 80 USD = 1200 USD

2. Labor costs

Two operators spent eight hours sorting parts at the customer’s facility. Their regular hourly rate is 50 USD. Since the work was performed on a Saturday, we must add a 100% premium. In addition, a process engineer and a quality engineer were involved in the issue, each spending four hours analyzing the problem on Friday. Their average hourly rate is 100 USD.

Clabor = 2 * (8 * 100 USD + 4 * 100 USD) = 2400 USD

3. Processing costs

As an immediate containment action, the injection molding machine was stopped and inspected, and the slide mold was cleaned. All work was completed within two hours. The cost of one hour of unplanned downtime for this machine is 150 USD.

Cmachine = 2 * 150 USD = 300 USD

4. Extraordinary and external costs

Following the customer complaint, the customer imposed a standard contractual penalty of 2,150 USD on our organization. We also incurred additional expenses, including fuel and the rental of a vehicle required for transportation. These amounted to 350 USD.

Cextra = 2150 USD + 350 USD = 2500 USD

5. Total cost of the event

Based on the costs listed above, we can calculate the total cost of the event.

COPQevent = 1200 USD + 2400 USD + 300 USD + 2500 USD = 6400 USD

Using this simple formula shows that, in this particular case, material costs accounted for just 18.7% of the total Cost of Poor Quality. The remaining 81% was essentially money spent on corrective, administrative, and logistical activities, as well as, ultimately, preserving the customer relationship.

Of course, in our organization, the number of variables and additional costs may be much higher. However, even these basic calculations demonstrate the scale of costs associated with a single quality issue. They can also serve as leverage in discussions with management about implementing process improvements and placing greater emphasis on preventive actions.

How to Reduce the Cost of Poor Quality?

Planning and implementing preventive actions is the most effective way to significantly reduce the Cost of Poor Quality. However, before we can put these actions into practice, we often encounter resistance, particularly from top management. The main obstacle is, of course, money, which may be essential to implementing the planned improvements. So how can we convince the CFO to invest in “something” that could potentially save us much more money in the future?

The 1-10-100 Rule: Why Prevention Is the Cheapest Option

The classic 1-10-100 rule is a great example of a simple concept that clearly illustrates how costs increase over time.

  • 1 USD – the cost of correcting an error during the design or early quality planning stage, e.g. as part of an FMEA analysis
  • 10 USD – the cost of detecting and correcting the same error once the part has reached the production line, e.g. through rework or sorting
  • 100 USD – the cost of eliminating a defect after a non-conforming product has left our facility and reached the customer, e.g. including contractual penalties

Now, imagine a situation in which company management decides to save 5,000 USD by refusing to send employees to training or approving the installation of a Poka-Yoke system on the production line. How much could a single customer complaint end up costing the company?

Risk Analysis: Predicting the Cost of Poor Quality

The earlier a problem is detected, the better. Ideally, this should happen when the entire project still exists only on paper. So how can we identify potential sources of future problems? A detailed risk analysis can help us do just that. The best approach is to use FMEA, probably the most widely used and effective tool for this type of analysis.

FMEA (Failure Mode and Effects Analysis) links a potential cause to the effects it may produce. The purpose of this tool is to eliminate or, at the very least, minimize risks associated with product design or manufacturing processes. FMEA is performed during the planning stage as well as throughout subsequent phases of the product life cycle or process execution.

However, FMEA is not the only option. There are also other useful risk analysis tools, each with a different level of complexity. These include:

  • ETA – particularly useful for complex systems involving numerous interacting components or potential events.
  • Risk Matrix – a simple analysis based on a two-dimensional matrix in which the likelihood and consequences of a given event are assessed.

Physical and System-Based Process Safeguards Against Human Error

A more costly solution involves preventive measures known as Poka-Yoke. Their purpose is to:

  • reduce or completely eliminate the possibility of making an error during a process
  • detect and signal when an error has occurred

Simple examples of Poka-Yoke include using mounting holes designed to prevent incorrect fixture installation. Everyday examples include the shape of connectors such as Ethernet or HDMI, which allow a cable to be plugged in only in the correct orientation.

Another solution is Jidoka, which focuses on detecting and signaling errors, as well as stopping the process in order to:

  • detect a non-conforming product before it occurs or after it has been produced (depending on the system implemented)
  • prevent damage to machinery or equipment

Examples of such solutions include sensors, cameras, and inspection systems. An important element of the Jidoka concept is also the requirement to resolve the problem before the process can be restarted.

Machine Maintenance and Autonomous Maintenance

A preventive approach is essential when it comes to production lines. The foundation for this is a TPM (Total Productive Maintenance) system, based on the principle that planned inspections and maintenance are better than repairing equipment after a breakdown. This is particularly important when a failure occurs at a time of peak demand for a particular machine.

Effective Analysis of Existing Problems

Another challenge arises when a company already has a “hidden factory” in place and the team spends its time constantly “putting out fires” instead of focusing on prevention. In such cases, the only option is to address the problems that already exist. However, to ensure that corrective actions are truly effective, it is worth following a few basic principles:

  • use a structured approach to problem-solving, e.g. the 8D Report
  • avoid solving problems individually; instead, draw on the knowledge and experience of a cross-functional team
  • assess the risk of the same or similar problems occurring in other products and processes
  • do not allow temporary solutions to become permanent; implement all actions required by the action plan
  • periodically verify the effectiveness of the actions taken (and do so more than once!)

Summary

The Cost of Poor Quality (COPQ) represents the financial impact of producing a product or providing a service that does not meet requirements. Depending on whether a given issue affects the customer, these costs can be divided into:

  • Internal failure costs – the product is still within the company.
  • External failure costs – the product has already been shipped to the customer.

Another category is hidden costs of poor quality, which are often overlooked by the accounting department but may include consequences such as damage to the organization’s reputation.

The simplest way to reduce the Cost of Poor Quality is through prevention. Useful tools and approaches for this purpose include FMEA, Poka-Yoke, Jidoka, and TPM.

We’ve covered an important topic that is sometimes underestimated. I hope this article has helped you better understand the scale of the problems that can result from a single, seemingly insignificant process error.

See you in the next article!

FAQ – Frequently Asked Questions

What are the Costs of Poor Quality (COPQ)?

COPQ represents a company’s financial losses resulting from process failures. These costs are divided into internal (before shipment), external (at the customer’s facility), and hidden costs (e.g. reputational damage and overtime).

What are hidden costs of poor quality?

These are costs that go undetected by the ERP system. They include wasted engineering time, reputational damage, building up “just in case” inventory, and declining team motivation. They are like the part of an iceberg hidden beneath the surface.

What is the simplest way to calculate the cost of a single failure?

Simply add up four components: material costs, labor costs, machine downtime, and additional expenses such as customer penalties or expedited shipping.

What does the 1-10-100 rule tell us about the Cost of Poor Quality?

It demonstrates that prevention is the cheapest option. Correcting a defect at the design stage costs PLN 1, reworking it on the production line costs PLN 10, and fixing it at the customer’s facility costs as much as PLN 100. The cost of a failure increases dramatically the later it is detected.

How can the Cost of Poor Quality be reduced?

Prevention is key. This involves using risk analysis, implementing Poka-Yoke safeguards, applying the Jidoka concept, and maintaining production equipment through TPM.

Marcin Ożóg

About the Author: Marcin Ozog

Marcin is a Quality Engineer and auditor with over a decade of experience, primarily in the aerospace industry. He has successfully implemented quality management systems based on ISO 9001 and AS9100 and prepared special processes for Nadcap accreditation. His hands-on experience has taught him how demanding customer collaboration can be and how to build strong supplier relationships. Rather than focusing on dry theory, he analyzes real-world case studies and shares solutions proven in day-to-day manufacturing operations.


Disclaimer
The information presented on this website reflects the author's personal opinions and should not be attributed to any organization for which he has worked or currently works.

Leave a Reply

Your email address will not be published. Required fields are marked *

scroll to the top of the site